Submitted by 334 on
Symptom
Solicitation total cost and cost/piece is not being calculated when the cost and date fields are added to the solicitation in the lookup table.

Cause
The issue has been confirmed as a product defect and has been reported to our Research and Development team.
 
Resolution
Please refer to KB article 4771-Scheduled fixes  to see if this is scheduled for a fix.
Additional Information
On-line help:
Solicitations Layout
Field Name
Field Label
Lookup Table Type
Length
[Default]
Description
sol_cost
Cost per piece
none money
 
 
This field represents the cost per piece for this solicitation. It is generated by the system and is the sol_tlcost (total cost) divided by the sol_pieces (number of pieces).
sol_tlcost
Total Cost
none money
 
 
This field represents the total cost associated with this solicitation. This field is generated by the system and is the sum of the sol_print, sol_other, and sol_postge columns.
Article Type
Product Defect
Product Line
Millennium
Product Module/Feature
Table Maintenance
Product Version
2013.5
Database Engine
Oracle
Ranking
No votes yet